Photo: Boa table by Stefan Diez for Hay, 2023, with extruded legs in Hydro Circal 75R, an aluminium alloy made with at least 75% post-consumer scrap.
01Why place matters
Same material, different place
Two aluminium extrusions can look identical and meet the same alloy standard, yet one can carry five times the carbon of the other. The difference is not the metal but where it was made, and on what power.
For most materials the biggest single variable is the energy used to make them, and that depends on place: the electricity grid, the fuel for furnaces and kilns, and how efficient the plant is. Transport, often the first thing people think of, is usually much smaller, with some important exceptions. Where something is made also decides the social and environmental risks in its supply chain, from deforestation to forced labour, and a growing set of EU rules now asks companies to prove where their materials come from.
This deep dive draws on 150 grades in the 13 families most affected by place: electricity-hungry metals, silicon and glass, and heavy, low-carbon stone and concrete, where the journey can matter as much as the making.
The grid behind the factory
Each kilowatt-hour from Norway's mostly hydro grid carries about 0.03 kg CO₂e. The same kilowatt-hour in Poland, India or South Africa carries 0.6 to 0.7, more than twenty times as much. The EU average is about 0.2 and the world average about 0.46.
So a process that runs mostly on electricity, such as aluminium smelting, steelmaking in an electric arc furnace, silicon refining or injection moulding, can change its footprint several-fold just by moving country. Processes that burn gas or coal for heat, such as glass melting, cement kilns and brick firing, depend less on the grid and more on the fuel.
Grid averages are only a starting point. A factory with its own hydro or solar, or a direct supply contract, can be far below its country's average.
Grid electricity: kg CO₂e per kWh
Average grid electricity, lifecycle basis (Ember), 2025–2026 data. A factory buying renewable power can be far lower than its country’s grid.
Sources: Our World in Data: carbon intensity of electricity (data from Ember)
A world map of grid carbon
The same figures on a map. Each dot sits over a country and its size shows the carbon in a kilowatt-hour of that country's average grid electricity.
The pattern is clear: hydro, nuclear and wind give small dots across Scandinavia, France, Switzerland, Brazil, Canada and New Zealand. Coal-heavy grids give the biggest dots, in South Africa, India, Indonesia, Bangladesh and Poland. Most of the world's factories sit somewhere in between, which is why the same material can carry very different footprints depending on where it was made.
Switch to the Europe view to compare neighbours: a part made in Poland uses electricity with well over ten times the carbon of one made in Norway or Sweden.
Grid electricity around the world (kg CO₂e per kWh)
Dot area shows the value; hover a dot for the country. For reference: European Union 0.2, World 0.46. Average grid electricity, lifecycle basis (Ember). Base map: Natural Earth.
Aluminium: the clearest case
Smelting aluminium takes a great deal of electricity, and the International Aluminium Institute (IAI) names electricity as the main source of variation in its footprint. The IAI's 2023 global average for primary aluminium is 14.8 kg CO₂e/kg; in its indicative comparison, metal from hydro-powered smelters comes out around 10 and from coal-powered smelters around 30.
In the database, primary aluminium smelted on coal power is 20 kg CO₂e/kg and low-carbon primary from hydro power is 3.5 kg CO₂e/kg. The typical primary 6063 is 10.6 kg CO₂e/kg, lower than the IAI's global average. Recycling changes the picture again: recycled wrought aluminium is 1.35 kg CO₂e/kg, because remelting scrap needs only a fraction of the energy of smelting.
So for aluminium ask two questions: how much scrap is in it, and where was the primary metal smelted? A certified low-carbon or recycled alloy can cut the footprint of the metal by more than half.
Aluminium by power source and scrap content (kg CO₂e/kg)
Sources: IAI: aluminium carbon footprint FAQs
02Making it
Process energy: often the smaller part
Turning a material into a part usually takes far less energy than making the material. Injection moulding uses about 1.5 kWh per kilo of part, nearly all of it electricity. Moulded in Norway, that adds about 0.04 kg CO₂e per kilo; in China about 0.8, and in India about 1.
Compare that with the plastic itself: polypropylene is 1.85 kg CO₂e/kg and ABS 3.25 kg CO₂e/kg. Even on a coal-heavy grid the moulding is smaller than the material, and on a clean grid it almost disappears. Choosing a lower-carbon grade, such as recycled polypropylene at 0.9 kg CO₂e/kg, saves more than moving the moulder from China to Norway.
The Material checker adds process carbon for the country you choose, so you can see both parts of the footprint side by side.
Injection moulding: kg CO₂e per kg of part, by country
Process energy only, for a typical industrial line, with each country’s average grid. Add the material’s own footprint separately.
When the process is the footprint
There are exceptions. Metal powder bed fusion, the most common way to 3D print metal parts, melts powder layer by layer with a laser or electron beam, and the database puts it at about 35 kWh per kilo of part. Printed in Norway or France that adds about 1 to 1.5 kg CO₂e per kilo; in Germany about 12, in China about 18 and in India over 23.
That can be several times the footprint of the metal itself: 316 stainless steel is 4.4 kg CO₂e/kg. For printed metal parts, the print bureau's electricity matters more than the alloy, and packing builds densely and cutting support material reduce it further. The same applies, on a smaller scale, to other electric processes such as powder-bed nylon printing and autoclaved composites.
3D print (metal powder bed fusion): kg CO₂e per kg of part, by country
Process energy only, for a typical industrial line, with each country’s average grid. Add the material’s own footprint separately.
Electricity-hungry materials
Aluminium is the extreme case, but the same logic applies wherever electricity or high-temperature heat dominates. Electronics-grade silicon is 135 kg CO₂e/kg, much of it from purification in electrically heated reactors, and copper is 2.75 kg CO₂e/kg. The database's recycled green steel is 0.5 kg CO₂e/kg, against 2.1 kg CO₂e/kg for ordinary mild steel.
Glass and cement are different: most of their energy is fuel burnt in furnaces and kilns, and much of cement's carbon comes from the limestone itself. For these, the recipe matters more than the grid: recycled cullet in glass, such as recycled glass at 0.65 kg CO₂e/kg, and less clinker in cement.
Energy-intensive materials and recycled versions (kg CO₂e/kg)
03Moving it
Transport: sea, road and air
Transport is usually a small part of a material's footprint, because ships are very efficient per tonne carried. The UK government's 2025 conversion factors give about 0.016 kg CO₂e per tonne-kilometre for an average container ship. Shanghai to Rotterdam via Suez is about 10,600 nautical miles (around 19,600 km), so shipping a kilo of goods adds about 0.3 kg CO₂e, and about 0.4 when ships go round the Cape of Good Hope.
Road costs several times more per tonne-kilometre: the GLEC framework gives about 0.07 to 0.11 kg for heavy trucks, so 1,000 km by lorry adds about 0.1 kg CO₂e per kilo. Air is the outlier. Long-haul air freight is about 0.6 to 0.9 kg per tonne-kilometre, so flying a kilo 9,000 km adds 5 to 8 kg CO₂e, more than the footprint of most materials.
- Sea: about 0.3 kg CO₂e per kilo from China to northern Europe
- Road: about 0.1 kg per kilo for every 1,000 km
- Air: about 5 to 8 kg per kilo on a long-haul flight
The practical rule: avoid air freight, and for light, energy-intensive materials look at the factory's energy before the distance.
Sources: Air vs sea CO₂ per tonne-km, citing DESNZ 2025 factors (FreightAmigo) · DESNZ 2025 factor: long-haul international air freight (Climatiq) · GLEC framework v3.2 freight factors (Green Calculus) · Routing options between Shanghai, Rotterdam and New York (Port Economics, Management and Policy)
Heavy and low-carbon: when the journey matters
The rule flips for heavy materials with a low footprint. Granite is 0.38 kg CO₂e/kg and limestone 0.075 kg CO₂e/kg, so the 0.3 kg CO₂e of a sea crossing from China nearly doubles granite's footprint and multiplies limestone's several times over. Add trucking at each end and the journey can be the biggest part of a stone floor's carbon.
The same goes for slate, bricks, concrete and timber such as kiln-dried spruce at 0.19 kg CO₂e/kg. For these, a local quarry, brickworks or sawmill is usually the low-carbon choice, and it keeps regional skills and supply chains alive. Ask how the stone or timber travelled, not just where it was cut.
Heavy, low-carbon materials (kg CO₂e/kg). A sea crossing from China adds about 0.3
04Claims and paperwork
Green electricity claims
Many suppliers now say a product is made with renewable electricity. There are two ways to count it. Location-based figures use the average of the grid the factory is connected to. Market-based figures use what the company buys, such as a supply contract with a wind or solar farm (a power purchase agreement) or certificates such as Guarantees of Origin. Under the GHG Protocol, companies report both.
A market-based figure can reflect a real clean supply, or a certificate bought from a distant hydro plant while the factory runs on the local grid. The GHG Protocol is revising its rules: its proposals would require certificates to be matched hour by hour and to come from generation that could actually be delivered to the factory. A revised standard is expected in late 2027.
For materials, look at the EPD. EPD programmes require the electricity assumptions to be documented, so check which electricity was modelled and whether certificates were used, to see whether a low figure comes from the factory's real supply.
Sources: GHG Protocol: overview of the Scope 2 revisions · ESU-services: modelling electricity mixes in EPD
Certification that follows the material
Chain-of-custody schemes carry information about origin along the supply chain. For metals, the Aluminium Stewardship Initiative, ResponsibleSteel and the Copper Mark (now Veramark Assurance) certify sites and, for some products, track certified material through to the buyer. FSC does the same for wood. An EPD gives the verified footprint of one product from a named factory or group of factories, which makes it the most useful single document for comparing where things are made.
New EU rules on origin
Several EU laws now make origin a compliance question, not just a carbon one.
- CBAM puts a carbon price on imports of cement, iron and steel, aluminium, fertilisers, electricity and hydrogen, so imported metal made on clean power faces a lower charge than metal made on coal. The Commission plans to extend it to steel- and aluminium-heavy downstream products.
- EUDR requires proof, down to the plot of land, that cattle, cocoa, coffee, oil palm, rubber, soya and wood did not come from land deforested after 2020.
- The Forced Labour Regulation bans products made with forced labour from the EU market and from export, whether made in the EU or elsewhere.
- ESPR brings product rules and digital product passports, with iron and steel (targeted for 2026) and textiles (2027) first in line.
- CSRD, after the Omnibus simplification, covers only companies with over 1,000 employees and €450m turnover, and limits what they can ask of smaller suppliers. Large customers will still ask for origin and carbon data.
- 1 January 2026CBAM: the definitive period starts. Importers of cement, iron and steel, aluminium, fertilisers, electricity and hydrogen above 50 tonnes a year must be authorised and pay for embedded emissions.
- 19 July 2026ESPR: ban on destroying unsold clothing, accessories and footwear (medium-sized firms later).
- 30 December 2026EUDR: applies to most operators and traders.
- 1 January 2027CSRD: new scope (over 1,000 employees and €450m turnover) for financial years starting from this date.
- 1 February 2027CBAM: certificates go on sale.
- 30 June 2027EUDR: applies to certain micro and small operators.
- 30 September 2027CBAM: first annual declaration and surrender of certificates.
- 14 December 2027Forced Labour Regulation: products made with forced labour banned from the EU market.
- Carbon Border Adjustment Mechanism (EU) 2023/956
- EU Deforestation Regulation (EU) 2023/1115
- Forced Labour Regulation (EU) 2024/3015
- Ecodesign for Sustainable Products Regulation (EU) 2024/1781
- EU Conflict Minerals Regulation (EU) 2017/821
Sources: Jones Day: the CBAM definitive phase (March 2026) · VinciWorks: EUDR delayed again, what is now fixed · Finnish Government: EU ban on products made with forced labour · Cooley: a short introduction to ESPR (May 2026) · Clifford Chance: Omnibus I concludes CSDDD and CSRD reforms
05Choosing
Made with clean power
Some producers sell the benefit of a clean grid or high scrap content directly, with a declared figure you can specify. Hydro's low-carbon aluminium is smelted on Norwegian hydropower and its recycled range is made from post-consumer scrap. Ovako makes steel almost entirely from scrap, and Boliden makes copper with renewable energy and recycled electronics. Ask for the product's own figure and how it is verified, rather than relying on the country of origin.
Hydro Reduxa aluminium alloysHydroHydro Reduxa is a series of certified low-carbon aluminium alloys. While the average kgCO2/kg for aluminium is 16.7, Hydro Reduxa has a maximum of 4.0. The reduction is achieved through the use of renewable energy (hydropower) and integrated manufacturing at Hydro's plants in Norway. Image Hydro.Image: Hydro
Hydro Circal 75R aluminium alloyHydroHydro Circal 75R is recycled aluminium made up of a minimum of 75% post-consumer scrap, such as window frames, doors and facades that have reached the end of their life. The balance being a combination of manufacturing waste and alloying elements to bring it in line with 6060 specification. Image Hydro.Image: Hydro
Ovako recycled steelOvakoOvako products consist of an average of 97% recycled steel scrap, according to the company (around 800,000 tons per year). Ovako mills recycle their own steel scrap, as well as scrap from downstream manufacturing industries and end of life products. Steel can be remelted into new steel without loss of quality.Image: Ovako
Boliden recycled copperBolidenCopper mining and smelting have a significant carbon footprint. The global average, according to the International Copper Association (ICA), is 2.3 kgCO2e/kg.Image: BolidenLocal, low-energy materials
The other route is materials that need little energy and can be made close to where they are used. Unfired clay bricks and plasters, bricks pressed from demolition waste, and cements that replace part of the clinker with widely available calcined clay all cut the energy of firing and the distance travelled. Regional plant materials, like Alpine hay pressed into wall surfaces, tie a product to a place in a way customers can see and check.
K-Briq recycled construction brick by KenoteqKenoteqThe Kenoteq K-Briq is produced from over 90% recycled construction and demolition waste - such as plasterboard, brick, stone, rubble and mortar - mixed with a cement-free binder. The mix is compressed at high pressure and cured, as opposed to being fired like conventional clay products.Image: Kenoteq
ClayTec clay brickClayTecClayTec clay bricks are unfired clay bricks for weather-protected load-bearing and semi-structural masonry applications. They are paired with clay mortar.Image: ClayTec
Limestone calcined clay cement, LC3LC3 ProjectLimestone calcined clay cement (LC3) cement produces 30-40% less CO2 emissions compared to regular cement. The reduction is achieved by partially substituting (20-70%) clinker with calcined clay and limestone.Image: LC3 Project
Organoid natural fibre interior surfacesOrganoid TechnologiesOrganoid surfaces are made with Austrian Alpine hay, harvested by hand on steep mountain slopes at an altitude of over 1,700 m.Image: Organoid TechnologiesSpecifying where it's made
- Ask where the energy-intensive step happens (smelting, melting, firing, printing), not only where the product is assembled
- For aluminium, steel and copper, ask for recycled content and a product-specific carbon figure, ideally in an EPD
- Check whether a renewable-power claim is location- or market-based, and what certificates back it
- Avoid air freight; for stone, brick and timber, prefer local sources
- For wood, rubber and other EUDR goods, ask for the plot-level origin data suppliers will need anyway
- Ask about forced-labour due diligence for high-risk materials and regions
- In the Material checker, add a process and choose the country of manufacture to see its carbon next to the material's